The first segment of the giant “lying skyscraper” The Line in Saudi Arabia will be built by 2030

At the World Economic Forum in Davos, new details about the Neom megaproject in Saudi Arabia became known. In particular, new information appeared about the construction of The Line (“Line”) 170 km long and 500 m high. At the forum, the representative of the project reported that laying the foundation for the first stage of the “Steep skyscraper” will begin this year and clarified when they would appear there to appear there The first tenants.

Source of images: Neom

The NEOM complex will spread in the territory approximately equal to the area of ​​Belgium. The Line will become its capital. In addition to him, skyscrapers will be built as part of the project and recreation areas in the open air will be created. The complex, by the way, is built in the immediate vicinity of the Suez Canal – one of the most important world navigable arteries. This plays a key role in providing a complex, which in the future must satisfy the daily needs of nine million inhabitants.

The organizers of the project proceed from the assumption that in the foreseeable future oil will cease to bring superprofits, and Neom should become a source of income due to tourism. In the meantime, the project brings benefits to manufacturers of cement and metal. It is alleged that Neom already consumes 20 % of the global production of steel used for the manufacture of reinforcement, piles, foundation and concrete structures.

How should it turn out

The first phase of the “lines” will have a length of 2.4 km. Currently, piles are already being driven for this site, and concrete filling will begin later this year. The construction of the site is planned to be completed by 2030, and 300 thousand people will be able to settle in it.

The city will be controlled by artificial intelligence at all levels. The entire transport infrastructure will be exclusively electric. Ideally, the city’s power supply should be provided only by solar and chicken energy, however, reserve diesel generators are provided and, possibly, other energy sources – this issue remains open.

Discussing the prospects of the settlement of the complex, the organizers emphasize its long -term character and are not afraid that even a hundred years can take it. The main thing is to start, and success, in their opinion, will be ensured by the uniqueness of the project.

admin

Share
Published by
admin

Recent Posts

Review of the Nvidia GeForce RTX 5080 video card and Blackwell architecture

The GEFORCE 50 line of video cards takes place in the usual direction from the…

12 minutes ago

NVIDIA released the driver with the support of the GEFORCE RTX 5090 and RTX 5080 video cards

NVIDIA has released a fresh package of the GEFORCE Game Ready 572.16 WhQL graphics driver.…

34 minutes ago

Google taught the Gemini AI-Chat Bot to create diagrams and visualize data from tables

Google developers continue to expand the integration of their Gemini AI Bot with different services…

43 minutes ago

Asus did not see anything wrong with the fact that her motherboards are clamping video cards

ASUS made an official statement after the emergence of reports on the network that the…

59 minutes ago

Bitcoin investments brought Tesla $ 600 million profit

Tesla, a part of the assets of which is invested in bitcoins, was able to…

1 hour ago

Europe ordered the development of a truck for delivery to the moon of supplies and equipment

Europe intends to actively participate in the development of the Moon, both together with the…

2 hours ago